<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">
Institutional Repository

An investigation into stock capacity utilization of a manufacturing line at a catalyst manufacturer

Loading...
Thumbnail Image

Authors

Munilal, Joel Jeremy

Ndou, Ndivhuwo

Ramdass, Kemlall

Journal Title

Journal ISSN

Volume Title

Publisher

Southern African Institute for Industrial Engineering (SAIIE)

Abstract

Bottlenecks in a manufacturing line are the fundamental reason that obstructs productivity.Accurately and effectively recognizing bottleneck areas, can improve the use of limitedassembling resources, increment the framework throughput, and limit the complete expenseof production. This article focuses on improving the throughput of a manufacturing line in anautomotive component supplier plant. The project aims to develop a solution to increase thecapacity of the production system by following an adapted design thinking method to approachthe problem. The first step in the process is to Underline (Emphasize), followed by Define,Research, Analyse, Ideate, and Conclude with Testing and Verification. Tools used in thisproject are Process mapping, Genchi Gembutsu, Time studies, Ishikawa diagrams (Root causeanalysis), and five why analysis. Insight was gained in the Emphasize phase using Gemba walksand observation.

Description

Citation

J.J. Munilal, N. Ndivhuwo, K. Ramdass. AN INVESTIGATION INTO STOCK CAPACITY UTILIZATION OF A MANUFACTURING LINE AT A CATALYST MANUFACTURER. 33rd Annual Southern African Institute for Industrial Engineering Conference (SAIIE33). 3-5 October 2022, The Capital, Zimbali, South Africa. 699-717 (19 pages)

Endorsement

Review

Supplemented By

Referenced By