Effects of stemming and timing on rock fragmentation and downstream crusher throughput at a selected quarry in South Africa

Loading...
Thumbnail Image

Authors

Madanda, Samuel Alpheus

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The optimisation of a quarrying operation depends on the effectiveness of rock fragmentation and the resulting throughput of the primary crusher. However, a typical quarry in South Africa is experiencing inconsistent rock fragmentation, with excessive oversize material, known as boulders. As a result, efficiency has decreased due to expensive secondary breaking. This study examines how stemming length and inter-hole delay affect fragmentation and crusher throughput in a granite quarry. Six controlled blasts were carried out on site for different combination of stemming lengths and inter-hole delays. Blasts #1, #2, and #3 focused on the inter-hole delay timing set at 17, 9, and 6 ms respectively. The remaining blasts #4, #5, and #6 explored the stemming lengths of 2 m, 1.5 m, and 1 m respectively. The resulting fragmentation sizes were analysed using the WipFrag software while crusher performance was measured in terms of throughput. The Kuz-Ram model and the Kuznetsov-Cunningham-Ouchterlony (KCO) model were then used as part of the sense-making exercise. Finally, at the primary crushing plant, the run-of-mine feeds from the six blasts were measured while stoppages and throughput rates were monitored over a period of a month. The data analysis revealed that the KCO fragmentation model was the best fit for the quarry. Finer fragment sizes and higher crusher throughput were noted for shorter stemming lengths (1 m). On the other hand, fragmentation quality decreased with longer stemming (2 m) producing oversized fragments that impeded throughput. The adequate stemming may therefore be around 1.5 m. With the inter-hole delay timing, larger fragments were produced with shorter (≤ 6 ms) and longer (≥ 9 ms) delays. Optimal delay would therefore be between 6 ms and 9 ms for the granite quarry. Lastly, the crusher throughput improved by 8% (from 277 tph to 300 tph), approaching the required 325 tph with stemming and delay adjustments.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By